NSQF Assistant Pavement Layer.pdf

Assistant Pavement Layer

  • Job DescriptionThis job role is responsible for assisting in construction of flexible pavements or in rehabilitation works for roads constructed manually by selecting, handling and placing materials and carrying out earthwork for construction of base course and wearing course of the roads using appropriate hand tools and equipments
  • CodeCON/Q1001
  • SectorConstruction
  • NSQF LevelLevel 2
  • Notional Hours300
  • Accrediting BodiesCSDCI
  • Certifying BodiesCSDCI
  • Proposed Occupation

    Roads & Runway Construction                         

  • International Comparability

    INDIAN NOS

    Comparable UK / Australia NOS

    CON/N01001: Identify, handle, store, tools and construction materials for road construction works

    Comparable UK NOS:

    MPQPO09: Receive, store and handle materials for processing

    CON/N01002: Prepare base course for road by surface cleaning and carrying out earthwork manually

    Comparable UK NOS:

    COSVR374: Reinstate excavation and highway surfaces

    CON/N01003: Shift and place hot asphalt by suitable/ specified means and place the mix at appropriate work location

    Comparable UK NOS:

    LANLBOCU16v1: Assist with maintaining structures and services
    COSVR59: Apply coatings as structure protection

    CON/N8001: Work effectively in a team to deliver desired results at the workplace

    Comparable UK NOS

    COSVR642 :Conform to productive work practices

    CON/N9001: Work according to personal health, safety and environment protocol at construction site

    Comparable UK NOS:

    COSVR641: Conform to general workplace health, safety and welfare

     

    Formal structure of the qualification

    Title of unit or other component

    (include any identification code used)

    Mandatory/ Optional

    Estimated size (learning hours)

    Level

    CON/N1001: Identify, handle, store, tools and construction materials for road construction works

    Mandatory

    56

    2

    CON/N1002: Prepare base course for road by surface cleaning and carrying out earthwork manually

    Mandatory

    112

    2

    CON/N1003: Shift and place hot asphalt by suitable/ specified means and place the mix at appropriate work location

    Mandatory

    110

    2

    CON/N8001 Work effectively in a team to deliver desired results at the workplace

    Mandatory

    24

    2

    CON/N9001: Work according to personal health, safety and environment protocol at construction site

    Mandatory

    48

    2

  • Progression Pathway

    Pavement Layer L-4

  • Qualification File NSQF Assistant Pavement Layer.pdf
  • Supporting Documents
  • Formal structure of the qualification
    Title of unit or other component Mandatory/ Optional Estimated size (Hours) Level
    CON/N1001: Identify, handle, store, tools and construction materials for road construction works Mandatory 56 2
    CON/N1002: Prepare base course for road by surface cleaning and carrying out earthwork manually Mandatory 112 2
    CON/N1003: Shift and place hot asphalt by suitable/ specified means and place the mix at appropriate work location Mandatory 110 2
    CON/N8001 Work effectively in a team to deliver desired results at the workplace Mandatory 24 2
    CON/N9001: Work according to personal health, safety and environment prot ocol at construction site Mandatory 48 2